Skip to content

Document template · generic.project.risk_register

Risk Register

  • Render-verified
  • Informational
  • Version 1.0.0

Project risk register listing identified risks with category, likelihood (1-5), impact (1-5), computed severity (L x I), owner, mitigation and lifecycle status. Severity thresholds: 1-7 low, 8-14 medium, 15-25 high.

JSON Schema

Fields in this template

Data sent to the API is validated against the template’s JSON Schema before anything is rendered. This template defines 18 fields:

Field Required Type Description
entity Required string
project_name Required string
project_code Required string
project_manager Required string
as_of Required date
risks Required array of object
risks[].id Required string
risks[].description Required string
risks[].category Required enum
risks[].likelihood Required integer
risks[].impact Required integer
risks[].owner Required string
risks[].mitigation Required string
risks[].status Required enum
escalations Optional array of string
register_owner Required object
register_owner.name Required string
register_owner.title Required string

POST /render

Generate it

One POST /render call: send your JSON, get the finished PDF back. Or skip the JSON entirely and describe the document in plain language on chut.app.

curl
curl -X POST https://api.papii.eu/render \
  -H "X-API-Key: YOUR_API_KEY" \
  -H "Content-Type: application/json" \
  -d '{
    "template": "generic.project.risk_register",
    "data": { ... },
    "options": {"language": "en"}
  }' -o risk-register.pdf

Frequently asked questions

What is “Risk Register”?

Project risk register listing identified risks with category, likelihood (1-5), impact (1-5), computed severity (L x I), owner, mitigation and lifecycle status. Severity thresholds: 1-7 low, 8-14 medium, 15-25 high. On papii this document is available as template generic.project.risk_register: a JSON Schema plus a deterministic PDF renderer, so the same data always produces the same document.

Can I generate a Risk Register with AI?

Yes. chut.app — the AI back office papii powers — fills this template from a plain-language description: you describe the document in one sentence, the AI structures the data, papii validates it against the schema and renders the PDF. Developers can also call the papii API directly with structured JSON.

Is the Risk Register template legally compliant?

This template is render-verified: its schema, sample data and PDF output are automatically tested on every release. It is published with status “ready”, meaning it has not yet been through papii’s final legal review. Where it references specific legislation, that is stated in the template description — always have a professional check documents with legal effect before relying on them.